top of page

Amy Johnson WC Refurbishment

Details

Client: University of Sheffield
Architect: Castle Owen

M&E: A & P Dynamic Design

Duration:  6 weeks

Value: £0.2M

Scope

Strip out and removal of existing wc’s to the Amy Johnson Building.

 

Works included:

 

Full strip out of existing wc’s.

New partition walls.

New Plaster wall finishes.

Vinyl Flooring.

Décor.

Grid Ceilings.

Installation of new IPS Systems.

New Sanitary ware.

New mechanical extract, radiators.

New lighting, handryers, emergency lighting, fire alarms.

Install of new fire doors sets and architraves.

New fixtures and fittings: Mirrors, Soap Dispensers, Toilet roll holders.

 

Final result being an outstanding toilet refurbishment setting president for future toilet refurbishments across the University of Sheffield Campus. To which the same specification is being used.

bottom of page