The Dentistry project originally started with the refurbishment of a new Lab. 3 Months down the line we have now completed our 6th set of Bathrooms, with a further 2 remaining. This will complete a total upgrade throughout the building.
The works have consisted of a strip out of the existing Bathrooms, a full reconfiguration of the spaces, IPS paneling, Sanitaryware, Tiling, Ceilings, and Floor coverings.
All works have been carried out within a live building environment, and with total consideration to the departments needs.
Branded UOS Dispensers.
Automatic Sensor Taps.
Urinal Run with installed IPS System.
Vanity Run of Basins.
New WC Cubicle layout.